November 04, 2008

RAIL IS CUT AND TRANSPORTED TO BUILD A RAMP FOR NEW INCOMING EQUIPMENT

Today we pushed the trailer up to East Bidwell St. to pick up 75 pound rail for a new ramp that will be needed to bring the 25 ton GE locomotive in Red Bluff. We cut the rail to the required lengths and hauled them back to the wye where we will drill the holes for the guage rods that will be needed to hold the track together at the proper width. More pictures to follow during construction and the move of the PACTIV locomotive. Frank Fuson

No comments: