March 13, 2007

MoW crew clearing brush through Folsom

We were first able to get all of the trimming finished at the Supe's house and then we did some switching and set out to clear debris on the RoW starting at the wye and ending at Blue Ravine Dr.

March 12, 2007

Mother Load Crossing MP 136.7

Where did the track go? There it is!


Many thanks to Frank Fuson and the gang and Richard Halk from Halk rentals for loaning us his excavator for the day!

"Bullard" MP 130.4

This spur went to a rock quarry. Switch is still intact but tracks end after switch. About 300' down the tracks from here was a bark plant that burned down. It is currently zoned industrial.

Need to make a call!

March 11, 2007

Pictures along the ROW

MP 135.6
MP 136.1
MP 136.1
(MP 136 is laying on the ground to the right of the tracks)


MP 120.4

SPUR




Sibley crossing MP112.4





Track Inspection






March 10, 2007

DONATED EQUIPMENT FOR THE P&SVRR

Seen here is equipment that has been donated to the PSVRR and sits in Red Bluff, California. We are looking for ideas for getting it to Folsom.







March 09, 2007

Stations along the Placerville Branch

DIAMOND SPRINGS DEPOT-BEHIND WALMART AND ACROSS THE STREET ON MOUSOURI FLAT ROAD
TOWN OF EL DORADO DEPOT- ACROSS FROM THE FIRE STATION BEHIND THE SCHOOL.
EL DORADO CONT.

SHINGLE SPRINGS-GRAB SOME FRUIT!
SHINGLE SPRINGS STOP OVER OF THE HANG-MAN EXPRESS HEADED FOR PLACERVILLE, CA.
SHINGLE SPRINGS CONT.



FOLSOM DEPOT