February 12, 2012

Pictures from 2006 of MP 112.7 in Folsom


 It is great to see the momentum of the PSVRR gaining ground.  This past Saturday there were so many volunteers that parking was an issue.  That didn't used to happen and it is exciting to be close to seeing trains running again on the line.  


This post is from 2006 in the same location where a drainage ditch was dug out and the water redirected.  The water used to run down the middle of the tracks year round.  The post after these pictures shows the work from this past weekend.  

The "SWAMP"  circa 2006 MP 112.7

Joe Mayer rides "the wedge" with Al waiting for his turn. We would use the Skagit and flat car to push this through and then drag the  junk back to a clearing and clean off the wedge.  It was like riding a bad horse that had a tendency to buck you off half the time.  It would take about three days of this to get through to the end.


I took these pictures a few months after I did the drainage ditch. The tracks could finally dry out.  The ties have been under water for years but seem to be in relatively good shape.   

Culvert Work at MP 112 in Folsom on Feb 11, 2012

(click on any photo to enlarge)

At the wye

John beginning to dig 



Crew coming up on the scene






Later in the day after the culvert was inserted













January 25, 2012

RTC Brings Rail-With-Trail Expertise to Coastal California


WHY ARE THE EL DORADO SUPERVISORS NOT OPEN TO FINDING SOLUTIONS THAT BENEFIT THE WHOLE COMMUNITY?  
Rails-to-Trails Conservancy's (RTC) Western Regional Office has been watching with great interest the progression of plans for a rail-trail along Monterey Bay in the Central Coast of California.
So too have the people of Santa Cruz County, and the champagne corks were well and truly popping with the announcement recently that the Santa Cruz County Regional Transportation Commission (SCCRTC) had closed the deal to acquire the right-of-way beside the 32-mile Santa Cruz Branch Rail Line.
This 135-year old transportation corridor parallels California State Route 1 from the town of Pajaro in Monterey County, to Davenport, linking major tourism and activity centers as it crosses the Pajaro River, Santa Cruz Yacht Harbor and the San Lorenzo River. In addition to providing non-motorized access to a number of state beaches, state parks, swim centers and the Monterey Bay National Marine Sanctuary, the proposed Santa Cruz Coastal Rail Trail would pass within one mile of more than half the county's population.
Now, trail advocates, such as the Santa Cruz County Friends of the Rail Trail, are anxious to see work begin on a multi-use trail alongside the active tracks. Enter RTC.
Utilizing our technical and planning experience with rail-with-trail projects, RTC staff met recently with the SCCRTC and a large group of regional officials, engineers, planners and community advocates to begin designing a Santa Cruz Coastal Rail Trail.
The line will continue to carry freight and recreational passenger services, so great emphasis will be placed on designing a trail that is safe for all users.
Entering this phase of rail-trail planning was the perfect opportunity for RTC to bring the Healthy Transportation Network's "Designing for Bicycle and Pedestrian Safety" Workshop to Santa Cruz to share the safety record of rail-with-trail projects, successful strategies for community stewardship of trails, and methods to avoid user conflict.
"A lot of rail lines in California are still in use for passenger and freight service, so we are seeing some really great rail-with-trail projects," says Steve Schweigerdt, manager of trail development for RTC's Western Regional Office. "Combining both a trail and an active train line makesincredibly efficient use of these corridors in our transportation system."
A project of the California Department of Public Health's California Active Communities program, the Healthy Transportation Network has been presenting this free workshop in communities across California for the past four years. They were able to bring the workshop to Santa Cruz thanks to help of local sponsors including the University of California at Santa Cruz, Santa Cruz County Cycling Club, Spokesman Bicycles, Family Cycling Center, Ibis Bicycles, Traugott Guitars, Mountain Bikers of Santa Cruz and Ecology Action.
Some more great news for the people of California came with the announcement this week that land has been acquired for the development of another mile of the city of San José's burgeoning trails network.
A remarkable multi-jurisdictional effort involving the city of San José, the Santa Clara County Open Space Authority (Open Space Authority) and the Parks and Recreation Department of Santa Clara County, the one-mile addition to the Three Creeks Trail will expand recreation and transportation options within the urban core, and create linkages between the Los Gatos Creek, Guadalupe River and Coyote Creek regional trails. It will also enable the continued growth in non-motorized commuting and errands that have been documented in annual San Jose trail counts since 2007.
Both of these projects are manifestations of a growing demand in California and across the country for healthier and more active options for getting from A to B.
"Growing active transportation mode share is critical to continued improvements in air quality, congestion mitigation,and health of California residents," Schweigerdt says. "Santa Cruz and San José are taking important steps in the right direction, and their residents and businesses will benefit."
Photo courtesy of Howard Cohen

January 24, 2012

Board Of Supervisors Meeting January 24 to decide the fate of the track in El Dorado County

These items are to be discussed and decided around 4:00 pm.  If you would like to call in and listen to the meeting the number is: (530) 621-6621
Please either support our license ratification in person or e-mail the Supervisors with a simple - "Please support the 5-year license for the P&SVRR" Vote yes to #38 and no to #39.


EMAIL OR CALL THE SUPERVISORS...
John Knight: bosone@edgov.us | 530 621 5650
Ray Nutting: bostwo@edcgov.us | 530 621 5651
Ron Briggs: bosfour@edcgov.us | 530 621 6513
Norma Santiago: bosfive@edcgov.us | 530 621 6577


Thank you for your support!!!

January 23, 2012

Mt Democrat
January 08, 2012 | Posted by Chris Daley
No. 10 Trails and/or rails?

TRAIN TRACKS, here located behind Walmart, will share the right of way with a hiking trail. Democrat photo by Pat Dollins

It was a bit of a banner year for the “rails/trails” issue. Advocates of one or the other or both turned out en masse on several occasions at the county supervisors chambers to pitch a particular perspective which often included one group and excluded another.  The board voted to adopt what became known as the Shingle Compromise or the Shingle Plan. That device grants seven or so miles between Missouri Flat Road in Diamond Springs and Shingle Springs to multi-use status, thus allowing train operations and trail activities within the Sacramento-Placerville Transportation Corridor. Prior to the Shingle Plan, rail use was technically limited to a couple of miles between Mother Lode Drive south of El Dorado and Missouri Flat.

By year’s end, the county had designated the 17 miles from Shingle Springs to the Sacramento County line as mixed use, including hiking, biking and equestrian. Rail use is proscribed, according to the board’s resolutions. Whether the county has the authority to dismantle rails, ties and train infrastructure as precursor to constructing a proposed Class I trail on that stretch of the right of way has not yet been resolved.  Early response from the Joint Powers Authority that administers the right of way indicated that El Dorado County does not have such authority, however, the county is looking into an appeal of that perspective.  The issue was last discussed at the Board’s Sept. 27 meeting wherein John Knight provided an update which included the JPA’s initial action and his letter asking that the decision be reconsidered.
As reported by the Mountain Democrat at that time, “the Shingle Plan Compromise enacted in March effectively ended the larger discussion of extending an excursion train capability from Shingle Springs to the county line. The newer issue for at least four of the five supervisors has moved on to determining what if any financial benefit can be realized by salvage and sale of  the rails and ties. As Knight’s letter suggests, proceeds would be used to fund further trail construction.”

As usual when rails and trails are on the agenda, the board room was packed that day with “trail people” and “train guys,” as the groups often refer to each other.  Knight, with some exasperation, told the audience that the matter at hand “was not to rediscuss the merits of rails versus trails, rather it was to inform the board of the JPA’s recent action.”  “This is not about whether or not to take out the rails,” Knight exclaimed. “Read my letter… The letter is out and we’re waiting for a response.”
Supervisor Jack Sweeney has remained adamant about keeping the Sacramento-Placerville Transportation Corridor’s railroad infrastructure in place pending results of exploring other alternatives for location of the trail.  “I believe there are alternatives for the trail that are cheaper and won’t require removal of the rails and ties,” Sweeney said. “People don’t want to go 10 miles to get on a trail, so it needs to be in an appropriate place. Don’t get rid of the bird in the hand.”  Sweeney’s mention of an “appropriate place” for the trail refers to the fact that, because of steep terrain, the railbed loops several miles south and east away from residential areas in the western part of the county.
Without a doubt, “rails and trails” are again likely to attract a good deal of attention from the public and from county government in 2012.
Share
Twitter
StumbleUpon
Email
This story falls on page "A1"
Short URL: http://www.mtdemocrat.com/?p=124407

Posted by Chris Daley on Jan 8 2012. Filed under 2011's Top Stories, Diamond Springs, Placerville, Shingle Springs. You can follow any responses to this entry through the RSS 2.0. You can leave a response or trackback to this entry

MTDEMOCRAT.com does not necessarily condone the comments here, nor does it review every post. Read our full policy.
No. 10 Trails and/or rails? | Mountain Democrat | Programmer Solution
January 8, 2012 - 11:30 am
[...] Springs, News, Placerville, Shingle Springs. You can follow any responses to this entry through the RSS 2.0. You can leave a response or trackback to this [...]
Reply
Jim Harville
January 18, 2012 - 4:33 pm

It is good to see the railroad back in the paper again, but I must point out several glaring inaccuracies in the article above…
The article states that “Prior to the Shingle Plan, rail use was technically limited to a couple of miles…”. In reality, several thousand riders have enjoyed riding virtually ALL the rails in El Dorado County over the course of the last eighteen months, with full approval by the county. The two miles mentioned are simply the section previously approved for the development of the Railroad Park Demonstration Train, a joint venture between the County Museum and the El Dorado Western Railway Foundation. Rail use has not been “proscribed”, i.e. prohibited or forbidden, on ANY portion of the rail corridor.
The description of the March 28th, 2011 Board action is also largely in error. While it did state that the County’s “priority” between Shingle Springs and the county line was the development of hiking, biking, and equestrian trails, it also called for staff to explore the “legality and feasability” of removing the rails, and to look at alternatives to rail removal. This process is ongoing, but is not looking real positive for proponents of the “Shingle Plan”.
As a strong supporter of a Rails WITH Trails program for the corridor, in which ALL parties win, I look forward to the Board of Supervisors taking up this issue again in the near future.
Reply
ARNOLD LANGE
January 18, 2012 - 5:20 pm

How does one go about riding the trains? I agree that the railway should be multi-use,

November 08, 2011

RATE THIS (AVG 5.0)
Groups at odds over use of land
Folsom supports preserving rail line as it asks for a denial of track removal
by Eric Laughlin/Telegraph Correspondent
A movement to preserve an 18-mile stretch of railway between Folsom and Shingle Springs for the potential development of an excursion train got a boost last week by way of the Folsom City Council.
In a 4-1 vote, the council approved a motion requesting that the Sacramento-Placerville Transportation Corridor Joint Powers Authority deny a request by El Dorado County to remove tracks from a portion of the corridor.
The vote follows a September finding by the JPA that El Dorado County does not unilaterally have the right to pull up the track to be sold to salvagers.
Trail proponents have argued that removal of the rails from Folsom to Shingle Springs (leaving tracks from there to Placerville for train development), would bring in as much as $1 million, which could pay for a trail on the already graded railway foundation. They have further argued that the private operation of an 18-mile excursion train is not feasible from an economic standpoint.
But the JPA, which comprises several local governments and agencies including El Dorado County and Folsom, concluded the track’s removal could threaten the continuity of the rail corridor.
Folsom Councilwoman Kerri Howell, who also sits on the JPA board, reaffirmed that finding prior to her vote.
“I don’t see anyway that taking 18 miles of rail and tie out of the middle of a railroad does not result in discontinuity,” she said. “What these people are trying to do is take the rail up tomorrow to ensure there’s never a rail. El Dorado County doesn’t have five cents to build three feet of trail, let alone 18 miles.”
Howell went on to cite a finding by the Department of Transportation that the proposed rail removal and sale would actually result in a net loss to the county of $150,000, since by law workers would have to earn prevailing wages.
Council members Steve Miklos, Andy Morin and Ernie Sheldon joined Howell in voting in favor of the measure.
“If the rails are lost, they’re lost forever,” Sheldon said. “They’re not coming back.”
He later suggested that trail and rail enthusiasts work together to meet both of their goals.
“I’m sure we can build that trail and build that train and do it together,” he added.
The lone “no” vote came from Councilman Jeff Starsky, who said he wanted more information and feedback from the city’s cycle enthusiasts.
Mike Kennison, who heads Friends of the El Dorado Trail, said he’s still hopeful that his side will prevail. He also questioned the DOT study cited by Howell.
“There was absolutely no inspection done before making that finding,” he said. “All the DOT did was make two phone calls.”
He went on to say that having both tracks and a trail is not possible, since grading a new trail could cost as much as $20 million.
Philip Rose is president of the Placerville Sacramento Valley Railroad, an organization that has already been running a single car up a portion of the tracks as part of a licensing agreement with the JPA. He said he was pleased with the decision, but at the same time hopeful that the decision will stand and that other member entities will reach the same conclusion.

August 08, 2011

Train returns to Latrobe after 54-year absence


Photo by Margaret Snider • The TelegraphEric Olds, left, vice president of the Placerville & Sacramento Valley Railroad, is shown here taking the Skagit for a short run earlier this year. The first passenger service to the town of Latrobe since 1957 will take place Aug. 6-7. Olds performs many volunteer duties in the organization including conductor and motorman.

8/2/11

By Margaret Snider Telegraph Correspondent

Aug. 6 and 7 will mark the first passenger train of the Placerville & Sacramento Valley Railroad (P&SVRR) to the town of Latrobe since 1957. Although some freight trains have run, there has been no passenger service since the 1957 special.  This will be a beginning for the P&SVRR, which had been negotiating with the Joint Powers Agency (JPA) for a five-year license to run excursion rail the full length of the line from Folsom to Diamond Springs.  “We got that agreement with the JPA,” said Philip Rose, President of the P&SVRR. On Tuesday, July 26, 2011, the agreement was ratified by the County of Sacramento and the City of Folsom.  “Now we’re just waiting for El Dorado County,” Rose said. El Dorado County is scheduled to decide on Aug. 16.  In the meantime, with the previously washed-out portion of track repaired and safety tested, the rail is ready for use with the Skagit, the line’s light-weight rail vehicle.  Fortuitously, the train is running the same weekend that Folsom High School is holding its all-class reunion.  Eric Olds, vice president of the P&SVRR, and one of the conductors for the weekend, said they did not plan it that way.  “We weren’t aware of it ahead of time,” Olds said. “We think it’s just a great opportunity for people who want to experience something unique about the area.”  When Rose heard of the high school reunion, he contacted Dean Handy, who is one of the movers of the reunion.  “He was really excited about the idea that people would be able to ride the train,” Rose said.  Handy, Folsom High School class of 1964, sent e-mails about the railroad to some of the landmark reunion classes.  “With this being a special reunion weekend for you,” Handy’s e-mail said, “I thought you and your classmates may enjoy taking a couple hours out of the day to experience this wonderful rebirth of a railroad.”  Handy is an enthusiastic participant and organizer of the reunion. He emphasizes that he is not in charge, he’s “just the most vocal and boisterous.”

Departure times for the excursions to Latrobe, as well as those for the shorter trip to Carson Creek, can be found at psvrr.com or by calling Gary Davis at (916) 834-3094.

In October, the P&SVRR is looking forward to a pumpkin run, also with light vehicles, and another excursion near Christmas. The ticket proceeds from all the excursions go to the efforts of the all-volunteer organization to save the historic rails and keep the trains running.

“We replaced maybe 200 ties on the washout,” said Rose. “So we’re hoping that if all goes well we can run heavy equipment at Christmastime.”

* * *

KNOW AND GO

What: Placerville & Sacramento Valley Railroad Excursion to Latrobe
When: Aug. 6-7, Saturday and Sunday
Where: Departing from Hampton Station, 155 Placerville Road, Folsom
Info: For times, tickets and information call Gary Davis, 916-834-3094 or go to http://psvrr.com



June 24, 2011

Recently At Folsom Junction





We were swapping equipment around at the wye 6/23/2011 Assisting were Al Onadera and Carl Curtis flagging, Hank Stiles operating the Burro Crane 
Ethane Doty operating the Howard Terminal #8 and Frank Fuson switchman and photographer.

 

June 02, 2011

Historic Rail Line Coming Back


(Folsom, CA)
Thursday, June 02, 2011
Ethan Doty and thirty other volunteers are working to lay new ties and track between Folsom and Shingle Springs. 
He is operating the Howard Terminal Engine today because it is big enough to carry the tools, ties, and track down the line to the next section the group will rebuild. 
Railroad President Philip Rose says while they rebuild the track to hold the big engines and cars, they are giving tours twice a month on a smaller engine called a Skagit…with plans for a Christmas line using the big engine.
PHILLIP ROSE: "Run Christmas trains on a short two-mile stretch of rejuvenated track this year..  That will create revenue for us to continue to develop the railroad…to improve the railroad."
Rose says they hope to have track laid and trains running to Shingle Springs by 2015…That is the 150th anniversary of the opening of the original line.