May 08, 2011

My turn: Tear down the El Dorado County Courthouse


Special to the Democrat

If the county of El Dorado would tear down the historical Main Street, Placerville, Courthouse it could sell the building material and build a new trail. Does this sound crazy to you? Well Ñ this is essentially what a few well intended but misdirected individuals have proposed to the Board of Supervisors in suggesting that the county tear out the 122-year-old Placerville Branch of the Sacramento Valley Railroad to speed up the building of a trail.
Not a trail for equestrians, or a mountain bike trail, but only a paved trail. And what is more disturbing is that the supervisors have entertained this presentation, whereby this group would take control of public assets owned by all county taxpayers, then turn them over to a commercial salvage enterprise. The salvage company would haul off these assets for their profit; some estimates suggest that the value of the rail could exceed $1 million.
Now you might be thinking that I donÕt see the need for a multi-use trail system in El Dorado County. I am a regular user of the Forni Road to Missouri Flat trail. I have observed the number of people who use this trail on a daily basis, and I believe that I have a reasonable understanding of who these people are and what they are doing. The overwhelming majority of trail users are walkers and joggers, who travel between one and four miles per day. I see an occasional bicycle, and once in a great while a horse will pass by.
While on the trail, I have talked with many of the trail users and I often ask them the same question: Does the trail have to be flat, in a straight line, or could it run with the lie of the land and meander along the railroad track? The answer is nearly always the same: It just doesnÕt matter as long as we have a place to walk and ride.
In 1991 the county of El Dorado, city of Folsom, county of Sacramento, and Regional Transit formed a Joint Powers Authority for the purpose of purchasing the Placerville Branch of the Sacramento Valley Railroad from the Southern Pacific Company. This allowed the preservation of the railroad right of way as a transportation corridor. However, prior to the purchase the Southern Pacific Company had removed the mainline rail between Missouri Flat Road and the city of Placerville.
In 2003 the El Dorado County Board of Supervisors approved the Sacramento-Placerville Transportation Corridor Master Plan. This plan was written over a two year period with input from a steering committee of local residents and advocacy groups interested in multiple uses of the trail, including excursion rail based programs, hiking, equestrian use and bicycling.
The master plan is specific about preserving the historical aspects of the corridor, and with great detail defines how trails will co-exist with rail operations on the corridor that is between 60 and 200 feet wide and 28 miles long.
During the planning process five public meetings were held at varying locations throughout the county to give the public input into the process. This master plan remains in effect as approved; the countyÕs Transportation Master Plan and Bicycle Circulation Plan also reflect the same statements regarding use of the corridor.
In 2009 the Board of Supervisors approved the concept plan for the construction and development of the El Dorado County Historic Railroad Park in the town of El Dorado. The Railroad Park would then be operated by the El Dorado County Museum for the purpose of displaying and operating a collection of railroad artifacts, by utilizing the former Placerville Branch line to provide a living history program. Riders would then relive the experience of rail transportation as it was from 1888 until passenger service ended in the 1950s.
The El Dorado County Historical Museum is operated by the county with one employee and a large contingent of dedicated volunteers who conduct tours, perform archive work and perform restoration of the historic rail artifacts at the museumÕs shop on Placerville Drive. All restoration work has been funded through private donations.
In June of this year I contacted Supervisor Jack Sweeney on behalf of the County Historical Museum where I have been a volunteer for the past 21 years. I asked Supervisor Sweeney to consider a resolution allowing the Museum to begin operating its rail based equipment between Mother Lode Drive (Mother Lode Y) and Missouri Flat Road. This would facilitate the re-certification of the track at no cost to the county taxpayers. In addition, the resolution designated the Museum administrator as the countyÕs representative to oversee the Railroad Park and Living History Railroad operation, thereby streamlining the process of access and development through efficient county administration. The resolution was requested on behalf of all those who frequently come to our MuseumÕs Engine House and ask, ÒWhen will it run, and when can I ride?Ó
During the Board of Supervisors meeting where the resolution was presented, Supervisor Sweeney was accused by members of the bicycle group of trying to slip something in below the radar, to sneak in a plan to which the public had not commented. The theme was to request more studies, take more time, and send the resolution before the Trails Advisory Commission and the Parks and Recreation Commission. They stated they have their own options, and they must be considered negotiators in these county matters. All of this regardless of the fact that the county Department of Transportation has grant funding pending to design and build a new paved and natural trail parallel to the tracks!
Well, I donÕt have a college degree but I do know a few things. I know that in order to operate a train, we must have two rails, and the rails must be continuous from beginning to end. I also know that if the tracks are removed it will be cost prohibitive to ever put them back, so when the trails (bicycle) people tell me that we have to negotiate for the use of the railroad I have wonder what they mean: Do we modify our equipment to use just one rail? Do we remove just some of the tracks? Do we remove it from the ends or from the middle? Do we get enough to move the train forward and backward? According to our bike folks, we just need 40 feet of old track and a rusty locomotive in El Dorado for kids to play on. Oh, by the way Ñ the supervisors have stated that they do not want to remove the track. They just want to make sure that all the recreational venues are provided for on behalf of our entire community.
So let me recap. We have a contiguous, operable railroad system that runs from Missouri Flat Road to the city of Folsom. Excepting two minor locations west of Shingle Springs, the track is in exceptionally good condition. The transportation corridor averages 100 feet wide, more than sufficient to build a Class 1 paved trail, a distinct equestrian trail, and a mountain bike single track, while retaining the historical railroad as is stated in all of the countyÕs transportation documents. As mentioned, a grant has been applied for by El Dorado County to develop the trails adjacent to the tracks from Missouri Flat Road to El Dorado and for the development of the Railroad Park. This would provide the township of El Dorado with this communityÕs first park, and trails will continue west as sequential grants are awarded.
Please join me in calling/writing your supervisor and ask what he or she can do to further protect and support the historical Placerville Branch line. Please do not obstruct this project by placing further unnecessary delays to study what has already been studied at taxpayer expense. DonÕt be persuaded to tear down and sell off our historical legacy and community artifacts ala yard sale bartering. All recreational corridor venues deserve our countyÕs best planning and we should stick to the established, approved plan.
Edward Cunha has been a volunteer with the El Dorado County Museum for 21 years.
Short URL: http://www.mtdemocrat.com/?p=15884

May 04, 2011

JPA agrees to a 5 year lease for the P&SVRR



On May 2nd, the JPA voted to pass the five year lease for the P&SVRR to run excursion trains.  The member agencies(Folsom, Sac County, El Dorado County) have to ratify the lease.  El Dorado County is currently looking at removing most the rail in their county.  The corridor is very wide (100 Ft. in most places) so there is plenty of room for everyone, trails and excursion railroad.  El Dorado County will vote on whether to move forward with removal of this 150 year old historical railroad on May 17!  We need your help in making sure the railroad is preserved for future generations.   It is connected to the 1st railroad ever to be built west of the Mississippi back in the 1850's!  


Everyone, everywhere has a voice and can make a difference in this.  
WHAT CAN YOU DO?
1) EMAIL & CALL each Supervisor:


Stating the importance of the Rail line in El Dorado County to you.
District 1 – John Knight – bosone@edcgov.us | (530) 621-5650
District 2 – Ray Nutting – bostwo@edcgov.us | (530) 621-5651
District 3 – Jack Sweeney – bosthree@edcgov.us | (530) 621-5652
District 4 – Ron Briggs – bosfour@edcgov.us | (530) 621-6513
District 5 – Norma Santiago – bosfive@edcgov.us | (530) 621-6577
THANK YOU FOR YOUR SUPPORT IN PRESERVING THE LINE!  

May 02, 2011

Rails Reconnected Over Previous Washout Area Near Latrobe California

Pictures By Don Lee

Thanks to everyone that helped out with this and the crew that installed the culverts. There will be equipment rolling over it for the first time this Saturday.  What an incredible ride it is from Folsom to Shingle Springs!  If you have not seen it yet, I highly recommend checking it out.  There are numerous outings coming up and the heavy equipment is being prepared to pull trains up the hill.  Stay Tuned!  


















WASHOUT NEAR LATROBE BEING REPAIRED LAST WEEK ON THE P&SVRR

Pictures by Don Lee

















All-
 
As promised I have updated information regarding this Saturday's track laying day at the what was formerly- that's right, formerly- the washout.  Some of us are now calling it "Latrobe Creek Crossing" or "Latrobe Creek Culvert."  I'd send pictures but I really want to entice you to come out and see it for yourself and perhaps drive a spike or two or twenty...
 
Here is the plan:
 
Anyone interested in brining their speeder to run to the job site can set on at Iron Point at 7:30 AM.  We will depart Iron Pt. at 8 AM by rail to go to Latrobe Creek Crossing.  On our way there, we will pick up the A6 currently sidelined at Veerkamp's so we will have it at the job site to push the speeder flatcar for rail distribution or other similar activities.
 
Anyone interested in assisting with loading the Chevy HyRailer can meet at the wye at 7:30 AM to load tools.  The HyRailer will depart the Wye at approximately 8 AM and drive to the job site via road.
 
Anyone driving to the job site is requested to arrive by 8:30 AM at the large gravel shoulder pull-out on Latrobe Rd. just passed (south of) the Deer Creek bridge where the tracks join up with Latrobe Rd. (formerly Cothrin Station on the railroad)- this spot is where a private grade crossing crosses the tracks to access the radio/cell towers on a nearby hill.  Speeder transportation will be provided to the temporary end of track where we will be laying rail (about .2 miles south of the pull-out)- or you can walk south along the track (RR East).  If you choose to walk, be especially careful to watch for Rattlesnakes as it is that time of the year again and one was killed at the job site this week.
 
Lunch for those who notified me in advance that they are coming will be provided by the FEDS Auxiliary.  Unless I hear from you before 3 PM tomorrow (Friday), you'll be on your own for lunch.
 
Please dress for work, boots are required, steel-toed preferred.  If you have a hard hat and/or work vest, please bring them along (I'll have some loaners).  I'll also have applications and waivers for signing if you need to pay dues or want to bring someone who would like to join.  Please bring water (some will also be provided).  Sunscreen and a hat are also recommended.  
 
If you can only come out for an hour or two please do come, we need as many folks as possible with some energy to help us drive spikes.  This is a very unique opportunity to try your hand at authentically practicing mid-19th century technology and techniques used by our forefathers to lay the iron ribbons that built this country and bound it together in unity.  Won't you come out and be a part of this historic activity?
 
Any questions, please do not email me as I won't have opportunity to see it.  Simply call me at 916.218.5984.
 
I hope to see you on Saturday (unless, of course, your helping out at the 20th Annual Handcar Derby in Folsom)!
 
Happy Rails,
 
Eric Olds
FEDS Director
P&SVRR Director/VP
916.218.5984
 

April 29, 2011

Letters Opinion Wednesday, April 27th, 2011 Posted by Letters to the Editor Mountain Democrat
Save our historical Placerville & Sacramento Valley Railroad



EDITOR: The Sacramento Valley Railroad ran the first train into Folsom on Feb. 22, 1856. The route through White Rock to Latrobe opened in 1864 and in 1865 Shingle Springs became the end of the line. The railroad brought prosperity to the region and after much financial, political and legal drama, finally reached Placerville in 1888.


Although passenger service ended in the 1930s, it is claimed that the Placerville Branch was one of the most profitable on the Southern Pacific system.


The railroad continued in operation until approximately 1978 hauling freight such as lumber, lime, produce, etc. The line was bought by a joint powers authority in 1996 under the Rail Banking regulations, and though recently “out of use,” has never been abandoned. Rail Banking means the right-of-way must be protected for future rail services.


The modern Placerville & Sacramento Valley Railroad Inc., a registered not-for-profit corporation, was created in 2008 in response to a request for proposal from the JPA for an Excursion Railroad Operator. With the support of our parent organization, the Folsom, El Dorado and Sacramento Historical Railroad Association, the new P&SVRR is now ready to begin service on select dates for the 2011 season.


Dozens of railroad volunteers have spent tens of thousands of hours in Sacramento and El Dorado counties clearing brush, cutting tree limbs and fallen trees. Hundreds of rail ties have been removed and replaced. For about 15 years volunteers have been acquiring equipment and reworking it to first-class status and are ready to roll.


All this has been brought about by little or no money. It is amazing what a group of volunteers can do. For the past two weekends, the trains have run excursion trips from Shingle Springs up to El Dorado from 9 a.m. to 4 p.m. Each trip carried a full capacity of excited passengers. This coming weekend will host a hand-car derby at the Iron Point/Bidwell site in Folsom. Runs are also scheduled to run in Folsom starting in May and continuing throughout the summer. There also will be a Rail Fest during the Memorial Day weekend.

A recent action by the El Dorado County Board of Supervisors has cast a shadow over the future of this iconic railroad. We could lose this important part of the history of El Dorado County forever, denying the future generations the right to enjoy what we railroaders have worked so long and hard to protect. A concerted lobbying effort by local trails enthusiasts has finally convinced the supervisors to explore the long and difficult process of removing the rails. This was done by cutting short a 10-year review period built into the county’s own documents, even though there was ample evidence the P&SVRR was on the verge of launching operations.

Two meetings ago it was agreed that the Trails and Rails would work together in protecting this right-of-way. However, at the next meeting all that we had agreed upon had no validity.

 
RAY RETALLACK and DICK REIN

Members, Placerville & Sacramento Valley Railroad



April 17, 2011

Letters Opinion
 | 

Supervisors’ action on trail is breaking hearts

EDITOR: Hey, wouldn’t it be great to take a train ride from El Dorado to Folsom this time of year when the fields are green and the wildflowers are prolific? That’s the dream of a group of enthusiastic volunteers who have been working for many years to see that very thing become a reality.
However, your El Dorado County Board of Supervisors is considering taking an action in the near future that will put an end to that dream forever.
At the March 28 board meeting a motion was made by Supervisor John Knight, seconded by Supervisor Ron Briggs, as follows: 1) Adopt the map establishing priority uses as follows: a) Segment 1-17.5 mile length from the county line through Latrobe to Mother Lode crossing as a multi-use trail including bike path and equestrian trail; b) Segment 2-6 mile length from Mother Lode crossing (mile marker 17.5) through Shingle Springs and El Dorado to Missouri Flat Road to be set aside as a joint multi-use trail for all trail users, historical railroad and an excursion train; c) Segment 3-Bike routes to the east of Missouri Flat Road existing Class 1 bike path, bike lanes, and bike route; 2) Direct staff to explore the feasibility and legality of removing the tracks in Segment 1 and consider if there are other alternatives to removing the tracks; and 3) Direct staff to return with further information on May 17.
Key words here are removing the tracks in Segment 1, which would not only be destroying a valuable historical resource in El Dorado County but, of course, would also make the dream of a large group of volunteers who have worked many hours and many years on the rail bed disappear.
So let your supervisor know how you feel about this issue and e-mail or write them soon. You can address letters to the Board of Supervisors, 360 Fair Lane, Placerville 95667 or go to the El Dorado County Website for e-mail addresses.
JOYCE THOMPSON
Kelsey

Keep the tracks


Editorials
 | 

Don’t say I never warned you when your train gets lost.
— Bob Dylan
from the song “It Takes a Lot to Laugh, It Takes a Train to Cry.
The El Dorado County Board of Supervisors is about to make the blunder of the century by agreeing to rip up the railroad tracks from Shingle Springs to the county line.
We’ll grant that nine miles from Shingle Springs to Diamond Springs may be enough track for the little bit of rolling stock the El Dorado County Museum volunteers have assembled.
We’ll also grant Supervisor Ray Nutting’s contention that the railroad ties west of Shingle Springs may not be in the best of shape and spikes could be loose.
But neither of those two arguments are sufficient to abandon a unique and irreplaceable asset. Ties can be replaced and spikes redriven. A real railroad right of way and its rails can never be replaced. To claim otherwise is believe in the Tooth Fairy and Daddy Warbucks.
Trails can be built alongside the rails. That, too, is a given. It is also a fact that building a paved  trail is expensive with or without the rails and requires extensive design and regrading. Just getting from Missouri Flat to Camino has cost thee county $8.5 milion. That came from special grants, but it didn’t happen in one year, despite having an entire rail-free right of way after Michigan-Cal Lumber Co. salvaged the rails from its private line and surrendered the right of way to the county and city. The city’s portion is not part of the $8.5 million and part of the city’s trail digresses from the original right of way. The whole trail that is now paved took over a decade to complete. Despite using an existing railroad right of way, regrading and new culverts had to be done. Creeks had flowed across the right of way and trees had grown up in the middle of it.
Before the Board of Supervisors so cavalierly surrenders 16 miles of track from Shingle Springs to the county line it had better consult with its other partners in the joint powers authority that governs the railroad right of way. Folsom has kept its line intact despite intensive commercial development. The rails cross major streets — Oak Avenue, Clarksville Road, Broadstone Parkway and Iron Point Road continuing along Placerville Road, eventually crossing into El Dorado County south of White Rock Road.
Folsom has a lot more resources, including a strong railroad volunteer support base, a rebuilt railroad turntable and now a revamped railroad museum. A serious excursion train effort is more likely to originate in Folsom and  travel to and through El Dorado County. El Dorado County still has the signal equipment at its road crossings.
Except for the Napa Wine Train and seasonal train service between the Railroad Museum in Sacramento and Freeport, the Placerville branch line is the only existing track near a major urban center. It is a branch line that features a beautiful countryside that is an up-and-coming wine region.
Don’t rip up the future. The right of way is sufficient to keep the rails and build a trail too.